Discuss the below:
1. Provide a project objective associated with the Astin Martin Graphics project. Include a list of assumptions about the project.
2. What is a work breakdown structure? What is a responsibility matrix? Using the Astin Martin project activity list and activity duration schedule, create a WBS and RAM.
Attachment:- Assist system engineering.rar