1.Which of the following is an example of value-added time?
- Processing time
- Wait time during inspection
- Wait time in inventory
- Both B and C
2.The just-in-time (JIT) philosophy attempts to reduce setup times, which will:
- increase batch sizes
- not affect batch sizes
- increase within-batch wait time
- decrease within-batch wait time
3.What do just-in-time (JIT) manufacturers demand from their vendors?
- High quality materials
- Low cost materials
- On-time deliveries
- All of the above
4.Objectives of just-in-time (JIT) manufacturing include:
- eliminating waste
- increasing inventory levels
- increased number of inspections
- all of the above
5.Inventory reduction is a ____ principle.
- just-in-time
- traditional processing
- economic
- wait time