In a job shop, effective capacity is only 79 percent of design change capacity, and actual output is 53 percent of effective output. What design capacity would be needed to achieve an actual output of 11 jobs per week? What is it's effective capacity?
A. The Design Capacity needed to achieve the required actual job outputs =
B. The Effective Capacity needed to achieve the required actual job outputs =