Textbook: Project Management Achieving Competitive Advantage by Jeffrey K. Pinto, Fourth Edition.
Case Study 14.3 The Navy Scraps Development of Its Showpiece Warship-Until the Next Bad Idea, Page 500.
Task:
• The U.S. Department of Defense has a long history of sponsoring projects that have questionable usefulness. If you were assigned as a member of a project review team for a defense project, what criteria would you insist such a project has in order to be supported? In other words, what are the bare essentials needed to support such a project?
• Why, in your opinion, is there such a long history of defense projects overshooting their budgets or failing some critical performance metrics? (Consider other project cases in this text, including the Expeditionary Fighting Vehicle discussed in Chapter 5.)
• "The mystery is not that the Zumwalt was canceled. The mystery is why it took so long for it to be canceled." Do you agree with this assessment? Why or why not?
• Google "criticisms of the Littoral Combat Ship" and identify some of the problems that critics have listed. In light of these problems, why do you think the Navy has pressed ahead with the development of the LCS?
Format your homework according to the give formatting requirements:
• The answer must be using Times New Roman font (size 12), double spaced, typed, with one-inch margins on all sides.
• The response also includes a cover page containing the student's name, the title of the homework, the course title, and the date. The cover page is not included in the required page length.
• Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.