Problem: Suppose a changeover is needed whenever two successive entities to a Workstation are of different model types, but not when they are of the same model type (in Simio®, the model types would be indicated by an Attribute value). The number of consecutive parts of the same model is called the "lot size."
What bad thing happens if the lot size is very small?
What bad thing happens if the lot size is very large?