Problem:
See link:
(https://fortress.wa.gov/ecy/publications/publications/0704033.pdf)
for case study and answer the following.
1. What are the VSM and the Kaizen for #1 project in "Packaging and Shipping".?
2. What was the original situation and the specific activities that were done in the project #1?
3. What were the results that were obtained and the training that was done?
4. Specifically point out the Lean techniques and methods that were used in project 1.
Assist in writing a two to three page paper discussing the Lean activities for this project.