Topic:
What are the success factors of accurate estimation of Construction projects?
Project Location: India
Project size: Medium
Reference 15-20
Problem statement for this assignment.
Suggest structure for A1, Part A
• Cover sheet
• Executive summary
• Table of content
• Introduction/Background
• Problem Statement
• Significance of Study.
• Research Questions/hypotheses,
• Aim and objectives
• Limitations/Delimitations (as applicable)
• References
Presentation and structure
The report is logical in its construction with no spelling, punctuation or grammatical errors. It includes all necessary and applicable sections. The report is mostly logical in its construction with 1 or 2 consistent spelling, punctuation or grammatical errors.