How would you decide between two capital project choices if the different analysis methods (NPV, IRR, etc.) were pointing to different options? What are the relative strengths and weaknesses of each? Original posts should contain a minimum of 120 words, and at least one response with a minimum of 40 words should be made to a classmate's post.