Problem:
Semans is a manufacturer that produces bracket assemblies. Demand for bracket assemblies (X) is 135 units. The following is the BOM in indented form:
Item |
Description |
Usage |
X |
Bracket assembly |
1 |
A |
Wall board |
5 |
B |
Hanger subassembly |
2 |
D |
Hanger casting |
3 |
E |
Ceramic knob |
2 |
C |
Rivet head screw |
4 |
F |
Metal tong |
4 |
G |
Plastic cap |
2 |
Below is a table indicating current inventory levels:
tem |
X |
A |
B |
C |
D |
E |
F |
G |
Inventory |
29 |
20 |
72 |
21 |
199 |
287 |
1,265 |
105 |
Required:
Question 1) What are the net requirements of each item in the MPS?
Solve the problem and show all work.