1. What are the drawbacks of a systems requirement document? How can a system requirements document be used to manage stakeholder expectations?
2. What is the relationship between time and money spent on systems analysis, time spent on design, and time spent on implementation? What are the benefits and drawbacks to each of the information gathering techniques available to systems analysts?