Questions:
1. What are the two variances between the actual cost and the standard cost for direct labor?
2. Who generally has control over the direct labor cost?
3. Would the use of standards be appropriate in a nonmanufacturing setting, such as a fast food restaurant?
4. What are budgeted fixed costs at normal volume?