1. Water flows in a 2-m-diameter sewer (finished concrete) with S ¼ 0.0016. Estimate the flow rate if the depth is
(a) 50,
(b) 100,
(c) 150, and
(d) 199 cm.
2. Water flows in a 120-cm-diameter sewer (finished concrete) with S ¼ 0.001 at a flow rate of 0.4 m3=s. What is the expected depth of flow?