Vicki's pizza take 165 seconds to make each pizza. vicki had desired output rate of 60 seconds per pizza with a bottleneck of 50 seconds per unit for enrolling the dough. solve the:
A. cycle time
B. Maximum output
C. Theorectical minimum # of workstations
D. Efficiency (need to answer from C for the formula)
E. balance delay