Assignment:
Problem statement
A company produces two types of dishwashers: Standard and Turbo. The production of a dishwasher from either model goes through three operations. The following table shows the time required for each operation in minutes.
|
Standard
|
Turbo
|
Stamping
|
3
|
6
|
Motor installation
|
10
|
10
|
Wiring
|
10
|
15
|
The time available for Motor installation is 60 minutes per hour. The company has two stations for Wiring and each of them is available for 45 minutes per hour.
The profit made is $20 from each Standard dishwasher and $30 from each Turbo dishwasher.
a. Extract the problem data in a Product Mix Table.
b. Define Decision Variables. Your definition must be complete.
c. Develop the Objective Function.
d. Develop the constraints.
e. Write Non-negativity constraints