Two W 310 ×74 steel wide-flange beams are bolted together to form a built-up beam as shown in the figure. What is the maximum permissible bolt spacing s if the shear force V= 80 kN and the allowable load in shear on each bolt is F = 13.5 kN (Note: Obtain the dimensions and properties of the W shapes from Table E-1(b).)