There are two resources in a process. Resource A is involved in two activities, which take it 8 minutes and 3 minutes each for each visit of a flow unit.
On average flow units visit the 8 minute activity (1.1 times) and visit the 3 minute activity (1.5 times). Resource B is involved in only one activity, which takes it 15 minutes and flow units visit an average of 1.0 times. There are two units of resource A and one unit of resource B.
What is the theoretical capacity of each resource pool. If the throughput of the process is 3 flow units an hour, what is the capacity utilization of each resource pool?