Total estimated overhead costs are 503250 of which 224400


Question - Julio produces two types of calculator, standard and deluxe. The company is currently using a traditional costing system with machine hours as the cost driver but is considering a move to activity-based costing. In preparing for the possible switch, Julio has identified two cost pools: materials handling and setup. The collected data follow:

Standard Model Deluxe Model

Number of machine hours: 57,500 60,000

Number of material moves: 580 780

Number of setup:s 120 725

Total estimated overhead costs are $503,250, of which $224,400 is assigned to the material handling cost pool and $278,850 is assigned to the setup cost pool.

Required:

1. Calculate the overhead assigned to each product using the traditional cost system.

2. Calculate the overhead assigned to each product using ABC.

Solution Preview :

Prepared by a verified Expert
Accounting Basics: Total estimated overhead costs are 503250 of which 224400
Reference No:- TGS02706637

Now Priced at $25 (50% Discount)

Recommended (95%)

Rated (4.7/5)