Three point loads 10000 7500 and 9000 kn act in line 5m


Three point loads 10,000, 7500 and 9000 kN act in line 5m apart near the surface of a soil mass. Calculate the vertical stress at a depth of 4m vertically below the centre (7500kN) load.

Request for Solution File

Ask an Expert for Answer!!
Civil Engineering: Three point loads 10000 7500 and 9000 kn act in line 5m