1) A project has the following cash flows. This project is of average risk and the WACC is 14.3%. Find the Profitability Index. Round your answer to two decimal places.
Year 0Year 1Year 2Year 3Cash Flow-$82$50$40$20
2) A project has the following cash flows. This project is of average risk and the WACC is 10%. Find the IRR. Input your answer as a decimal rounded to four places. For example, 20.75% should be input as 0.2075.
Year 0Year 1Year 2Year 3Cash Flow-$100$50$40$30
3) A project has the following cash flows. Find the payback period. Type in your answer as a number only, and round to the nearest hundredth. For example, if the answer is 10.789 years, type 10.79.
Year 0Year 1Year 2Year 3Cash Flow-$100$50$40$30