This project concerns voltage control of an industrial facility. This facility has four major loads fed from two synchronous generators. The system layout is shown in the figure below. As shown in the figure, loads L11 and L12 are fed by unit SG1 located at bus 1; loads L21 and L22 are fed by unit SG2 located at bus 2. In normal conditions, the bus coupler between bus 1 and bus 2 is left open (i.e. this breaker is a normally-open (NO) breaker). Loads L11 and L21 are critical loads. However, loads L12 and L22 are non-critical. Non-critical loads can be shed (i.e. turns off) if absolutely necessary. The load profiles are given in the table below.
Attachment:- 1542611_1_Project-statement.pdf