Theis method plot drawdown vs time for 4 observation wells


Theis Method plot drawdown vs. time for 4 observation wells, 5, 50, 100, 500 meters from well pumping at constant rate of 300 m^3/day in sandy confined aquifer. b=12 m, K=25 m/day, and S=10^-4. Given that depths to water in wells can be measured with an accuracy of about 0.5 cm, how long does it take to reach near-steady conditions?

Request for Solution File

Ask an Expert for Answer!!
Civil Engineering: Theis method plot drawdown vs time for 4 observation wells
Reference No:- TGS0644649

Expected delivery within 24 Hours