An embankment is traversed by a 6ft by 6ft concrete box culvert 100ft long. The upstream invert is at an elevation of 8ft and the downstream invert 4 ft. If the depth at the upstream end of the culvert is 8 ft, what is the flow through the culvert? Assume the culvert is in inlet control.