The total flow at a wastewater-treatment plant is 600 m3


The total flow at a wastewater-treatment plant is 600 m3 day-1. Two bio-logical aeration basins are used to remove BOD from the wastewater and are operated in parallel. They each have a volume of 25,000 L What is the aeration period of each tank in hours?

Request for Solution File

Ask an Expert for Answer!!
Civil Engineering: The total flow at a wastewater-treatment plant is 600 m3
Reference No:- TGS01667437

Expected delivery within 24 Hours