The three-station work cell at Pullman Mfg., Inc. is illustrated in Figure. It has two machines at station 1 in parallel (i.e., the product needs to go through only one of the two machines before proceeding to station 2).
![1788_Figure.png](https://secure.tutorsglobe.com/CMSImages/1788_Figure.png)
a) What is the throughput time of this work cell?
b) What is the bottleneck time of this work cell?
c) What is the bottleneck station?
d) If the firm operates 8 hours per day, 6 days per week, what is the weekly capacity of this work cell?