The specification for a plastic liner for concrete highway projects calls for a thickness of 3.0 mm 0.2 mm. The standard deviation of the process is estimated to be 0.02 mm. The process is known to operate at a mean thickness of 3.0 mm.
(a) What is the Cpk of the process? Please provide the formula, at least one step of calculation
(b) Is the process capable based on the Cpk value and why?