The soil in a borrow pit has a void ratio of 0.90. A fill-in-place volume of 20,000 m3 is to be constructed with an in-place dry density of 18.84 kN/m3.
If the owner of borrow area is to be compensated at Rs. 1.50 per cubic metre of excavation, verify the cost of compensation