The road has 12-ft lanes due toexpensive excavation it is


design a horizontal curve for atwo-lane road. The road has 12-ft lanes. Due toexpensive excavation, it is determined that a maximumof 34 ft can be cleared from the road's centerline toward the inside lane to provide for stopping sight distance. Also, local guidelines dictate a maximumsuperelevation of 0.08 ft/ft. What is the highest possibledesign speed for this curve?

Request for Solution File

Ask an Expert for Answer!!
Civil Engineering: The road has 12-ft lanes due toexpensive excavation it is
Reference No:- TGS0648050

Expected delivery within 24 Hours