Classic Attire is the designer and manufacturer of prom dresses. The president of Classic wants to switch to an activity-based approach in the upcoming year to assign prices to the gowns. Production line setups are a major activity at Classic. Next year Classic expects to perform 1,560 setups at a total cost of $107,640. Classic plans to produce 340 dresses of the A128 design, which will require 3 setups.
How much setup cost will be allocated to each dress of the A128 design that is produced?