A coal gasification process is to be fed with 15 metric tons per hour of limestone to capture sulfur from the coal gas. The limestone is supplied with average dimension 1.5 cm and must be reduced to 20 mesh before feeding to the gasification process. Recommend equipment to achieve the desired particle size and estimate the work required.