The hurdle rate for a possible project being looked at by a firm is 13%. The project is estimated to cost $450,000 now if taken. The estimated net cash inflows for the project for periods 1 through 5 are the following.
period 1 - $0
period 2 - $200,000
period 3 - $225,000
period 4 - $175,000
period 5 - $100,000
(A) Calculate the IRR and the NPV of the project. (B) Should the project be taken? (C) Why?
Can anyone please help tp understand this problem thank u I'm having some difficulties with IRR/NPV