The following observations are made about a work station on an assembly line. While designed for a maximum output rate of 35 units per shift, the standard rate of output for the work station is 31 units per shift, but only 29 units were actually produced on the last shift.
1. What is the utilization factor for this work station on the last shift?
2. What is the effifiency of this work station on the last shift?