The following information is from the materials requisitions and time tickets for Job 9-1005 completed by Great Bay Boats. The requisitions are identified by code numbers starting with the letter Q and the time tickets start with W. At the start of the year, management estimated that overhead cost would equal 110% of direct labor cost for each job.
Determine the total cost on the job cost sheet for Job 9-1005.