Quiz
The Lamborghini car company is considering adding a robot to its assembly process. To do so requires additional resources. The firms involved in the financing, parts suppliers, manufacturing hardware suppliers, design consultants, and the labor unions want to see a uml sequence diagram explaining the addition. The diagram should include the following:
• Robot required
• Raw materials required
• is chassis ready
• if not shut down assembly line
• Additional floor space
• Additional building
• Robot senses power
• Procure parts
• Engine
• Hood
• Fender
• Trunk
• Wheels
• Bumpers
• Tires
• Doors
• Interior
• Paint
• Glass
• Chassis
• Steering
• Suspension
• Rear end
• Wiring
• Assemble car
• Chassis
• Engine
• Transmission
• Rear end
• Wheels
• Suspension
• Body
• Fenders
• Wiring
• Trunk
• Lights
• Paint.