The design team for building an overhead bridge crane for


The design team for building an overhead bridge crane for use in-house within the company. The design team is considering a proposal to place a switch box on the wall with toggle on/off switches for control of the bridge, trolley, and hoist, respectively. What would be your design input to this committee? Explain the rationale behind your recommendations.


Your response should be at least 200 words in length. You are required to use at least your textbook as source material for your response. All sources used, including the textbook, must be referenced; paraphrased and quoted material must have accompanying citations.