Assignment:
Topic: The design and construction of a bridge to span a creek with a width of about 20 metres.
Location: Could be any (for example a park etc).
Word Limit: 1000 Words
The report should include the following:
SWOT analysis: discussing strength, weakness, opportunity and threats of the project in terms of technical, economical and environmental aspects.
Marking Criteria: Sample (HD)
Swot Analysis: Insightful analysis regarding all three technical, economical and environmental aspects.Comprehensive analysis in the context of the project.