During an 8-hour shift, the proportion of time X that a sheet-metal stamping machine is down for maintenance or repairs has a beta distribution with and β. That is,
![416_f5855355-d60a-4d0a-954d-d38331ef065f.png](https://secure.tutorsglobe.com/CMSImages/416_f5855355-d60a-4d0a-954d-d38331ef065f.png)
The cost (in hundreds of dollars) of this downtime, due to lost production and cost of maintenance and repair, is given by
C = 10 + 20X + 4X 2.
a Find the mean and variance of C.
b Find an interval in which C will lie with probability at least 0.75.