the contractor is responsible for obtaining all


The Contractor is responsible for obtaining all drawings, standards and specifications referred to in the bid documents and to request as needed additional or missing reference data from Owner.

Design Loads

Loads and forces as well as load factors used for design of module and its components shall be as per GS-904-0103.

Loading Data

Obtain all loading data necessary for design of structural support of mechanical, electrical and other equipment supported by skid or within module from relevant vendors. Skid design loading data shall include all forces generated by equipment including start-up, operational load, test load, etc., as stipulated in GS-904-0103.