The component designer for a major off the road vehicle manufacturer estimates that she can (a) increase the average time between failures of a part by 5%, or (b) reduce the average repair time by 10%. Currently, the average time between failures is 100 hours and the average repair time is 4 hours. Which option would be result in higher Availability? Show all calculations.