The Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of drilling. During the next production period, 240 hours of wiring time are available and up to 130 hours of drilling time may be used. Each air conditioner sold yields a profit of $15. Each heater assembled may be sold for a $11 profit. I need to know the optimum solution for x and y.