Caterpillar Corporation wants to build a spare parts storage facility in the phoenix, Arizona, vicinity. A plant engineer has identified two different location options. Initial cost of earthowrk and prefab building, and annual net cash flow estimates are detailed below. The annual net cash flow series vary due to differences in maintence, labor costs transportation charges, etc. If the MARR is develop a grap and choice table. Assume do nothing is anoption