Teri is an IE at Smith Manufacturing in Sarasota. She has been studying process line G to determine if an automated system would be preferred to the existing labor-intensive system. If Smith wants to earn at least 15% and uses a 15-year planning horizon, which alternative is preferred? Contributed by Paul R. McCright, University of South Florida
