1. Takt time is synonymous to
a. Cycle time
b. Manufacturing lead time
c. Allowable production time at the rate of demand
d. Delivery lead time
e. None of the above
2. What is true for idle time?
a. Necessary for workers to gain energy
b. Allowed time for personal use
c. Underutilized lost time
d. Necessary for setup
e. Allowed rest time
3. A time study analyst conducted a time study and calculated OT as 23.5 minutes for a process. The analyst also measured Activity Factor (AF) as 102% or 1.02. What is the Standard Time (ST) for this process if Allowance (A) is 14%?
a. 30 minutes
b. 27.33 minutes
c. 24.2 minutes
d. 26.79 minutes
e. None of the above
4. Poka Yoke is tool of
a. SPC
b. SQC
c. Quality improvement
d. Process improvement
e. 100% quality inspection