System requirements cannot be established without


Detailed Question: The homework is to make a one quiz question for each section and subsection in chapter 4 not all the chapter just to 4.3.2.2. it has to be multiple choice answers. Write the answer for each question in the hidden note. make it like the power point file I uploaded . The book is attached . I also uploaded my classmate homework as example.

Fill the power point file I uploaded.

this is the homework assignment instructions from the professor:

This homework assignments speaks to the creation of flash card study aids....in preparation for the upcoming INCOSE ASEP certification exam (...which will take the place of in lieu of the final exam for our course....).

Please take the following action to produce Question and Answer "flash card" study aids:

Each team should produce a minimum of 3 flash card inputs for each of the headings / subheadings within the INCOSE Systems Engineering Handbook (...see .ppt format provided...and additional notes below...).

This assignment covers INCOSE Systems Engineering Handbook Chapters 4 (inclusive). There will be subsequent homework assignments for successive chapters.

Of course, if a team feels that additional flash card inputs are necessary to adequately cover a given section / subheading within the INCOSE SE Handbook sections, they are encouraged to submit additional flash card study aid inputs.

Each team will use the flash cards they have produced to lead a class flash card review (...for their assigned sections....) during the lab portion of our class sessions.

When we review the flash card study aids during class...we will first show the .ppt question in "SLIDE SHOW VIEW" mode (....answer hidden...)....then after the class answers the question.....we will switch to .ppt "NOTES VIEW" mode (...to see the answer...).

Please use the .ppt format attached to this homework assignment entry....such that each team will provide the flash card study aids in a similar format.

Please note that the .ppt format....anticipates that the question will be in the main body of the slide.....and that the correct answer will be reflected in the "Notes View."

In order to complete the question & answer entries, you will need to set your .ppt application to "Notes View"mode (...see VIEW heading in the upper navigation bar...).

Given that the questions are of a multiple choice format, as you construct your question....please indicate if the answer requires the selection of one correct answer from the multiple choice options presented......or if the answer requires the selection of "X" (ie, vis a vis....citing a number greater than one) multiple choice options to define the correct answer.

Of course, each team member should submit a copy of the completed flash card .ppt input....to receive individual course credit in our course web-site within the myLMUconnect system.

Note: Our classmate Damien Lewke is investigating the use of an additional related study aid known as "Quizlet".....vis a vis the use of an automated system that would help prepare & score practice tests based on our flash card inputs. Further information on this opportunity is pending as of this date.

Question:
_______ are formal structured statements that can be verified and validated.

Multiple Choice Answers:
A) Technical Process
B) Needs
C) ISO/IEC/IEEE
D) Requirements

Question:
"Business or Mission Analysis process initiates the __________ process of the system of interest (SOI) by defining the problem domain..."

Multiple Choice Answers:
A) maintenance
B) stakeholder requirements
C) life cycle
D) solution

Question:

Which of these activities is NOT part of the Business/Mission Analysis process?

Multiple Choice Answers:
A) Define system requirements
B) Define the problem or opportunity space
C) Characterize the solution space
D) Evaluate Alternative solution classes

Question:
True or False. During the business and mission analysis process, the business managers are responsible for nominating major stakeholders?

Multiple Choice Answers:
A)True
B) False

Question:
True or False. A ConOps is a user-oriented document that describes system characteristic of the to-be-delivered system from the user's viewpoint.

Multiple Choice Answers:
A) True
B) False

Question:
"________ concept describes the way the system will be validated, delivered, and introduced into operations..."

Multiple Choice Answers:
A) Acquisition
B) Deployment
C) Support
D) Retirement

Question:
Business Requirements are often contained in a ______.

Multiple Choice Answers:
A) StRS
B) SyRS
C) validation report
D) BRS

Question:
A(n) _______ is any entity (individual or organization) with a legitimate interest in the system.

Multiple Choice Answers:
A) engineer
B) designer
C) stakeholder
D) competitorQuestion:
True or False. Providing baseline information for configuration management is a task within the manage the stakeholder needs and requirements definition activity.

Multiple Choice Answers:
A) True
B) False


Question:
"...stakeholder requirements capture should be conducted once near the ______ of the development cycle or as a continuous activity."

Multiple Choice Answers:
A) beginning
B) middle
C) end

Question:
True or False. Stakeholders can include the stakeholders of interoperating AND enabling systems.

Multiple Choice Answers:
A) True
B) False


Question:
True or False. Stakeholders who oppose the system, or detractors of the system are last considered in establishing consensus needs.

Multiple Choice Answers:
A) True
B) False


Question:
The _________ must first be populated with the source documents that provide the basis for the total set of system requirements that will govern its design.

Multiple Choice Answers:
A) business requirements specification
B) life cycle
C) IPO
D) requirements database


Question:
The life cycle concepts are essentially definitions of the functional concepts and rationale from the _________ perspective.

Multiple Choice Answers:
A) stakeholders
B) business
C) support
D) design


Question:
The StRS should be traceable to the stakeholder needs and to the _______.

Multiple Choice Answers:
A) ISO/IEC/IEEE 15288
B) BRS
C) activities process
D) IPO

Question:
System requirements are the foundation of the system definition and form the basis for _______.

Multiple Choice Answers:
A) cost, support, verification and validation
B) architecture, design, integration, and verification
C) boundaries, stakeholders, design, and schedule
D) concept, needs, validation, and processes


Question:
Which of the following is NOT a process activity for the system requirements definition process?

Multiple Choice Answers:
A) Prepare for system requirements definition
B) Define system requirements
C) Analyze system requirements
D) Update system requirements definition
E) Manage system requirements

Question:
System requirements cannot be established without determining their impact on ________ elements.

Multiple Choice Answers:
A) design
B) sub-system
C) lower-level
D) system

Question:
The set of requirements is _________ in that the requirements are not contradictory nor duplicated.

Multiple Choice Answers:
A) complete
B) consistent
C) feasible
D) bounded

Request for Solution File

Ask an Expert for Answer!!
Dissertation: System requirements cannot be established without
Reference No:- TGS01351285

Expected delivery within 24 Hours