Question - Lakeside Inc. manufactures four lines of remote control boats and uses activity-based coating to calculate product cost.
Activity Cost Pools
|
Estimated Total Cost
|
Estimated Cost Driver
|
Machining
|
$328,000
|
13,200 machine hours
|
Setup
|
65,000
|
290 batches
|
Quality Control
|
87,000
|
900 inspections
|
Suppose the Speedy beet requires 4,900 machine hours, 235 inspections, and 69 batches.
Using the activity rates, determine the amount of overhead assigned to the Luxury product line.