Question - Lakeside Inc. manufactures four lines of remote control boats and uses activity-based coating to calculate product cost.
Activity Cost Pools
|
Estimated Total Cost
|
Estimated Cost Driver
|
Machining
|
$317,000
|
13,800 machine hours
|
Setup
|
58,000
|
280 batches
|
Quality Control
|
98,000
|
710 inspections
|
Suppose the Speedy beet requires 1,500 machine hours, 92 batches, and 320 inspections.
Using the activity rates, determine the amount of overhead assigned to the Speedy product line.