Problem 1: Please suggest an assembly sequence from the e-drawing.
Problem 2: Please calculate the given information:
Using HSS cutter, Mild steel (cutting speed 25 m/min),
Dia 50 mm Spindle speed?
And what will happen if the spindle speed increase 30%?
Problem 3: Please calculate the production time from the following condition?
Using dia 16mm 4 flute HSS cutter work piece (BRASS cutting speed 60 m/min), feed per teeth is 0.1 mm/revdepth of cut 0.5 mm
Dimension of work piece: From L 120 mm x W 80 mm x H 60 mm
End milling to L 120 mm x W 80 mm x H 40 mm
Attachment:- Machining.rar