Project Risks Identification:
Use the project risk categories that you brainstormed during the previous week to categorize the risks that you have determined for this assignment.
Show a list of stakeholders and project teams that you utilized to identify risks.
Thoroughly describe each project risk (at least 8), which includes the source for identifying the risk.
Identify and show the specific technique that you used to identify the risks, such as cause and effect, a fishbone diagram, a SWOT analysis, interview notes, and an assumption list.
Project Risks Assessment
Create a table similar to the sample above, or use another method to list the risk, the likelihood of occurrence, and the overall severity of impact if it occurs.
Fill in the table with the information from the project identification utilizing the 2 scales that you determined as a part of your Discussion Board assignment. Be sure to consider both the cost and schedule impact as you determine the overall impact.
Rank your risks based on both the likelihood and impact using a technique, such as 2x2 matrix as shown in the assignment description section.