Southern Rim Parts estimates its manufacturing overhead to be $374,500 and its direct labor costs to be $1,070,000 for year 1. The first three jobs that Southern Rim worked on had actual direct labor costs of $66,000 for Job 301, $91,000 for Job 302, and $180,000 for Job 303. For the year, actual manufacturing overhead was $394,000 and total direct labor cost was $833,000. Manufacturing overhead is applied to jobs on the basis of direct labor costs using predetermined rates.
What was the over- or underapplied manufacturing overhead for year 1?