Soil have a void ratio of 0.68 as it exists in a borrow pit is to be excavated and transported to a fill site where it will be compacted to a void ratio of 0.45. The volume of fill required is 2500 m^3. Find the volume of soil that must be excavated from the borrow pit to furnish the required volume of fill.