Sketch feasible region and lp model for the problem


Blacktop Refining extracts minerals from ore mined at two different sites in Montana. Each ton of ore type 1 contains 20% copper, 20% zinc and 15% magnesium. Each ton of ore type 2 contains 30% copper, 25% zinc and 10% magnesium. Ore type 1costs $90 per ton and ore type 2 costs $120 per ton. Blacktop would like to buy enough ore to extract at least 8 tons of copper, 6 tons of zinc, and 5 tons of magnesium in the least costly manner. a. Formulate an LP model for this problem. b. Sketch the feasible region for this problem. c. Find the optimal solution.

Request for Solution File

Ask an Expert for Answer!!
Basic Statistics: Sketch feasible region and lp model for the problem
Reference No:- TGS0106288

Expected delivery within 24 Hours